Search

Offshore Wind Statistics

Commissioned Sites by Developer/Owner

Operator Sites
DONG Energy 13
Vattenfall 7
E.ON 4

Comissioned Sites by turbine manufacturer

Turbine Manufacturer Sites
Siemens Wind Power 17
Vestas Wind Systems 16.83
Bonus Energy 4.83

Installed Capacity by Country

Country MW %
United Kingdom 3,309.2 63.76
Denmark 871.45 16.79
Netherlands 246.8 4.76

Installed Capacity by commissioned site

Site MW
London Array 1 630
Greater Gabbard 504
Sheringham Shoal 316.8

Installed Capacity by Operator

Operator MW %
DONG Energy 1,793.25 34.55
Vattenfall 830.9 16.01
SSE Renewables 514 9.9

Installed Capacity & Number of Turbines by turbine manufacturer

Manufacturer
Model
MW %
Siemens Wind Power
Siemens SWT-3.6-107
Siemens SWT-3.6-120
Siemens SWT-2.3-93
Siemens SWT-2.3-101
Siemens SWT-2.3-82 VS
3,003.9
1,551.6
824.4
575
50.6
2.3
57.88
29.9
15.88
11.08
0.97
0.04
Vestas Wind Systems
Vestas V90-3.0 MW
Vestas V80-2.0 MW
Vestas V39-500 kW
Vestas V66-2.0 MW
Vestas V47-660 kW
1,393.32
957
426
5
4
1.32
26.85
18.44
8.21
0.1
0.08
0.03
Bonus Energy
Bonus 2.3 MW/82
Bonus 2.0 MW/76
Bonus 450 kW/37
245.05
200.1
40
4.95
4.72
3.86
0.77
0.1
You are here: lorc.dk  >  Knowledge  >  Offshore Wind Farms Map  >  Datasheet

Ems Emden Offshore Wind Farm

General Information

Official Name: Ems Emden
Alternative Name: ENOVA Offshore Windpark Ems Emden
Development Status: Commissioned
Layout Description: Single turbine
Location: Emden
Region: East Frisia
Country: Germany
Sea Name: Ems River
GPS Latitude: 53.3324
GPS Longitude: 7.2100
Distance From Shore: 0.6 km
Water Depth: 3 m

Timeline & Track Records

Project Start: 2003 (November) - Project consented
Construction Start: 2004 (June) - Foundation
First Power Generation: 2004 (October)
Commission Year: 2004 (October)
Developer: ENOVA
Enercon
Operator: ENOVA

Production & Performance

Total Installed Capacity: 4.5 MW
Total Number of Turbines: 1

Turbine, Tower & Substructure

Turbine:  
Turbine Manufacturer: Enercon
Turbine Model: Enercon E-112
Number of Turbines: 1
Rated Power pr. Turbine: 4.5 MW
Estimated Watt pr. Rotor m2: 441 watt
Operational:  
Cut-in Wind Speed: 2.5 m/s
Rated Wind Speed: 13 m/s
Cut-out Wind Speed: 28 m/s
Rotor & Hub:  
Rotor Type: 3-bladed, horisontal axis
Rotor Position: Upwind
Rotor Diameter: 114 m
Rotor Area: 10207 m2
Rotor Speed (min): 8 rpm
Rotor Speed (rated): 13 rpm
Blade Tip Speed (rated): 77.60 m/s
Blade Length: 52 m
Weight pr. Blade: 21 t
Blade Manufacturer: Enercon
Blade Model - Name: E-112/1
Nacelle:  
Drive Train Type: Direct drive
Generator Type: PMSG
Generator Rated Power: 4500 kW
Power Frequency: 50 Hz
Turbine Voltage Level: 400 V
Yaw Gears - Number: 8
Yaw Brake Type: Electric
Top Head Mass: 500 t
Tower:  
Structure Type: Tubular
Structure Material: Steel
Height: 100 m
Substructure:  
Structure Type: Gravity based
Number of Support Structures: 1
Support Structure Material: Concrete
Support Structure Description: The foundation is similar to those used onshore
Foundation Type: Gravity